Navigation menu:

Home

Editorial Board

Contact

Volume 5 (2021)


Evaluation of the production processes of a mining and processing enterprise

Andrii Cherep1*, Dar’ya Pilova1

Abstract

Technological advance of a mine with regard to ecological and economic evaluation takes shape as a generalized model of activities aimed at higher profit return, increased extraction of mineral resources from the subsoil, cut-down cost of mining and processing, and at reduced waste and harmful emission. The authors assess the open pit mining efficiency as a function of concentrate production cost as a case-study of Pokrovsky GOK, Ukraine. Statistical correlation of the production technology and economy and the produced ore flow quality is determined. A blending procedure is proposed for manganese ore from two groups of open pits to ensure the largest extractability of the useful component at the minimum cost of stripping. Preset quality ore should be accumulated at a processing plant for the concentrate production, with follow-on re-adjustment of the process circuits to ore with another content of metal. Free market economy has a material effect on production performance in the mining and processing industry, first of all, on the volume of products sold.

Keywords: open pit, manganese ore, ore flow quality, technology and economy efficiency, metal recovery, concentrate cost

References
  1. Shapar, A.G., & Yakubenko, L.V. (2012) Razrabotka ekologo-resursosberegayuschey tehnologii osvoeniya krutopadayuschih mestorozhdeniy. Ekololohiia i pryrodokorystuvannia, (15), 96-106.
  2. Chetverik, M.S., Babiy, E.V., Bubnova, E.A., & Tereschenko, V.V. (2013). Osnovnyie napravleniya ratsionalnogo prirodopolzovaniya pri otkryitoy dobyiche poleznyih iskopaemyih. Hirnychyi visnyk, 1(96), 58-62.
  3. Prokopenko, V., Pilov, P., Cherep, A., & Pilova, D. (2020) Managing Mining Enterprise Productivity by Open Pit Reconstruction. Eurasian mining, 1, 42-46. https://doi.org/10.17580/em.2020.01.08
  4. Morteza Paricheh, Morteza Osanloo. (2017). A simulation-based framework for estimating probable open-pit mine closure time and cost. Journal of Cleaner Production, 167, 337-345.
  5. Evren Deniz Yaylac, & H. Şebnem Düzgün. (2017). Evaluating the mine plan alternatives with respect to bottom-up and top-down sustainability criteria. Journal of Cleaner Production, 167, 837-849.
  6. Matías Siña, Juan Ignacio Guzmán. (2018). Real option valuation of open pit mines with two processing methods. Journal of Commodity Markets, Режим доступу: https://www.sciencedirect.com/science/article/pii/S2405851317302167
  7. Ryan C. Goodfellow, Roussos Dimitrakopoulos. (2016). Global optimization of open pit mining complexes with uncertainty. Applied Soft Computing, 40, 292-304.
  8. Shiv Prakash Upadhyay, Hooman Askari-Nasab. (2018). Simulation and optimization approach for uncertainty-based short-term planning in open pit mines. International Journal of Mining Science and Technology, 28(2), 153-166.
  9. Xiao-chuan XU, Xiao-wei GU, Qing WANG, Jian-ping LIU, Jun WANG. (2014). Ultimate pit optimization with ecological cost for open pit metal mines. Transactions of Nonferrous Metals Society of China, 24(5), 1531-1537.
  10. Prokopenko, V.I., Cherep, A.Yu., & Pilova, D.P. (2021). Justification of methodical approach to mining and processing efficiency evaluation. Gornyi Zhurnal, (8), 39-44. https://doi.org/10.17580/gzh.2021.08.07