Substantiation of constructive elements for mining C42 coal seam in the “samara” mine pjsc “dtek pavlogradugol”

V. Ruskykh1 & A. Burchenkor1

Purpose

The purpose is to substantiate the structural elements of the development system during the mining the C42 coal seam in the conditions of the Samara mine due to the introduction of modern mining equipment.

Methodology

The research is carried out by substantiating the parameters of the stress-strain state of the rockmass during the coal mining with longwall faces in order to substantiate the structural elements of the mining system during the extraction of the C42 coal seam in the the mine “Samara”.

Findings

In the work on the basis of analytical researches and software experiment the actual problem of substantiation of parameters of mining the C42 coal seam in the conditions of mine “Samara” of PJSC “DTEK Pavlogradugol” is solved. The results of the analysis of the nature and forms of rock pressure in longwall faces shows necessity of the increasing speed of the face movement, the stabilizing the rocks condition of the direct roof, and the loads on the fastening of the near face space. This researches were provided in the experimental set with simulating the different mining conditions. An analytical software experiment was carried out, and the analysis of the results of which showed that the stress-strain state of the rock mass significantly affects the intensity of rock pressure in the workings. Thus, when the speed of the wallface is more than 5 m / day, the value of the reference pressure zone is about 10 m, while the physical parameters of the reference pressure zone do not change. At the same time subsidence of sections of fastening sharply decreases, that corresponds to the classical theory of formation and management of a zone of temporary reference pressure. The analysis of industrial observations established the regularity of the change in the amount of freezing of the rock console of the main roof and the load on the fastening section from the speed of movement of the clearing face in the conditions of coal seam C42.

Keywords: сoal extraction, wallface, mechanized complex, stress-strain state of the rock mass

References
  1. Дичковский, Р.О., Русских, В.В., Овчинников, Н.П., Собещанский, Д.М. (2006) Компьютерные технологии для повышения эффективности работы угольных шахт. Науковий вісник НГУ, (7), 7-10.
  2. Дичковский, Р.Е., Расстрига, В.П., Мамайкин, А.Р., Русских, В.В., Медяник, В.Ю. (2007). Исследование влияния интенсификации добычи угля на технологические параметры. Науковий вісник НГУ, (9), 19-22.
  3. Дичковський, Р.О., Руських, В.В., Фальштинський, В.С. (2008). Імітаційне моделювання процесів гірничого виробництва при відпрацюванні тонких вугільних пластів. Матеріали міжнародної конференції «Форум гірників-2008», 77-83.
  4. Russkikh, V., Demchenko, Y., Salli, S., & Shevchenko, O. (2013). New technical solutions during mining C 5 coal seam under complex hydro-geological conditions of western Donbass. Mining of Mineral Deposits, 257-260. https://doi.org/10.1201/b16354-47
  5. Русских В. В., Яворский А.В., Яворская Е.А., Корольчук А.Н. (2017). Расчет оптимальных параметров работы очистного комбайна cls450 в условиях шахты “Cтепная” ЧАО «ДТЭК Павлоградуголь». Збірник наукових праць НГУ, (52), 245-254
  6. Русских, В.В., Гайдай, А.А. (2017). Аспекты и применение программного обеспечения “MineModeler” на шахтах Западного Донбасса. Уголь Украины, (4), 40-43.